Can I change a program pattern on the program controller while a program is running?

The following shows conditions that can be changed during the hold operation

Segment setting method(SEG.T) Segment time setting Segment ramp-rate setting
Segment condition Soak Ramp Soak Ramp
Hold SP N/A N/A
Final target setpoint N/A N/A
Remaining segment-time N/A

✔:Available、N/A:Not available

If you first place it in a Hold status, you can use key operations to change the target setpoint (TSP) and remaining time (R.TIM). However these changes are only temporary. Some conditions apply for the changes.

Productos y Soluciones Relacionadas

  • UP35A/UP32A

    The UP35A is a program controller with available 4 patterns and 40 segments (max.) and multi-channel contact I/O. It also includes a ladder sequence function. The UP32A is a compact program controller with up to 4 patterns and 40 segments available. It also includes a ladder sequence function.

    Leer Más
  • UP55A

    The UP55A is a newly-released 1/4 DIN sized program controller provides up to 30 program patterns, and simultaneous monitoring of 8 PV events, 16 time events, and 8 alarms. Also a ladder sequence function is included as standard.

    Leer Más