Managementul Activelor

A widespread issue in manufacturing plants is alarm overload. As formerly independent systems are integrated for more effective operation by fewer operators, each operator has to monitor an increasingly wider area and consequently deal with more alarms. Without rigorous alarm rationalization efforts, alarm flooding becomes a serious problem and increases the risk of safety and environmental incidents.

There are a number of documents such as EEMUA #191 and ISA 18.2 that help customers reduce alarms, but practical tools that can be implemented are still in short supply. Yokogawa proposes a smart approach to alarm management that helps customers achieve safe and agile plant operations based on the concept of combining practical bottom-up solutions with fundamental top-down improvements.

Yokogawa urges customers facing alarm flooding situations in their plants to introduce CAMS for HIS. It also benefits those who are looking for alarm management capabilities that go beyond the current generation of DCS alarm systems. Customers planning to consolidate their control rooms and design their alarm system to be in compliance with the ISA 18.2 standard will benefit from this product's practical and immediate solutions.

 

  • Sequence of Events (Exaquantum/SER)

    Exaquantum/SER is an event driven integrated reporting system that acquires alarm & event messages and point data from plant monitoring and control systems, and stores this information in a single database for ease of analysis.

    Vezi mai mult
  • Alarm Analysis (Exaplog)

    The new Exaplog event analysis package facilitates the quantitative analysis of problems in the DCS event log. By alternating analysis with alarm setting adjustment and operation sequence tuning, you can continuously improve operational efficiency.

    Vezi mai mult

Details

Service Description Yokogawa Deliverables
Alarm & Event Analysis ✓ Report of current state of Alarm
✓ Statistics of Alarm & Events
✓ Statistics of manual interventions
✓ Top 5 Bad actors for Alarms
Alarm Philosophy ✓ Alarm Philosophy document compliant with ISA 18.2 standards
Fundamental Nuisance Alarm Reduction ✓ Report of the Nuisance alarms in the plant
✓ Root cause for the Nuisance alarms
✓ Countermeasures to prevent alarming for the Nuisance alarms
✓ Report containing the before and after improvements from this service
ISA 18.2/EEMUA#191 based Alarm System Design
(Consultation & Training)
✓ Report of the current Alarm state and the gaps in design compared to standards
✓ Support in the design of the new Alarm system as per standards
✓ Training on conducting Documentation & Rationalization exercise
ISA 18.2/EEMUA#191 based Alarm System Design
(Software & Training)
✓ Installation, commissioning and training of Exaquantum\AMD to establish Alarm Master design database
Operation State based Alarm Management
(Consultation & Training)
✓ Report of the current state of Alarm set points for various operation conditions in the plant
✓ Design of the new Dynamic Alarm Management
Operation State based Alarm Management
(Software & Training)
✓ Installation, Commissioning and training of AAASuite/Exapilot for Dynamic Alarm Management
Alarm Monitoring & Improvisation
(Consultation)
✓ Report of current state of Alarm
✓ Statistics of Alarm & Events
✓ Statistics of Manual Interventions
✓ Areas of improvisation based on current state of Alarms
Alarm Monitoring & Improvisation
(Software & Training)
✓ Installation, Commissioning and training of Exaquantum\ARA for Alarm monitoring and reporting

Resurse

Prezentare generală:

Alarm management is not just a project that has a start and end date; it's a continuous cycle. Once the alarm system has been reviewed and improvements have been identified, we must check that controls are in place to ensure the alarm system remains functional. The key is to ensure that the system is continuously monitored and any changes are fully documented. There are seven key steps for alarm management. Rationalization is one of those critical steps.

Prezentare generală:

Summarizing the standard's 10 stages into four general tasks can simplify implementation and speed up the schedule.

Prezentare generală:

Modern historians do much more than just store process data. They also provide analysis, reports, and valuable operational and business information.

Prezentare generală:

March 2007

A widespread issue in manufacturing plants is alarm overload. As formerly independent systems are integrated for more effective operation by fewer operators, each operator has to monitor an increasingly wider area and consequently deal with more alarms. 

Prezentare generală:

March 2007

Alarm rationalisation and management is vital if plant operators are not to be overwhelmed by a rapid proliferation of alarm systems. A widespread issue in manufacturing plants is alarm overload. As formerly independent systems are integrated for more effective operation by fewer operators, each operator has to monitor an increasingly wider area and consequently deal with more alarms.

Downloads

Videoclipuri

Prezentare generală:

President & CEO of Yokogawa Electric Corporation of Japan, Shu Kaihori, discusses optimizing plant performance with Andy Chatha, President & CEO of ARC Advisory Group. 

Cauți mai multe informații despre oamenii noștri, tehnologie și soluții?

Contactează-ne

Sus