Is Production throughput an Operator overload an issue? Are network Security Risks going up? Cost of maintenance going up? Call outs more frequent? Modernize to CENTUM VP and take back control of your control system. Generate the maximum return with the minimum investment and ensure that your business remains competitive. Migrate to Yokogawa's latest plant control system from a legacy CENTUM V, CENTUM-XL, μXL, CENTUM CS, CENTUM CS 3000, or CENTUM CS 1000 DCS.
Modernize Without Touching a Single Wire
Move up to Yokogawa's world class CENTUM VP, in many cases without having to touch a single field wire! Our proven solution is low cost, low risk and puts you back in control of your maintenance costs and your control system.
The Yokogawa Upgrade Solution
Simple, Cost Effective
- Mix Multiple Releases - Our upgrade path allows for multiple versions to exist as part of the same system for indefinite period of time.
- Simply implemented - A onetime project, not different projects spread over many years with unknown costs and results.
- Eliminate Gateway issues - No gateways, bottlenecks or constraints.
Reduced Risk
- Reliable Database Conversion - Database conversion tools for maintaining intellectual property.
- Hardware Kits - Reuse of existing wiring and cabinets.
Peace of Mind with Progressive Lifecycle Compatibility
- 7 Sigma (yes, “7”) - The seven 9's reliability of the CENTUM VP system.
- Latest Technology - The latest technologies, from PCs, networks and controllers to asset management toolsets.
- We Bring You Forward – we support the first DCS controller we ever made in our current modern system.
- Quick and Easy - Some major platform migrations can be done is minutes instead of weeks or months.
Detalles
Technical Capability
Our technical capabilities can make all the difference in helping you achieve a smooth migration process. We perform a smooth migration to minimize plant downtime and raise your operation rate, support the continued use of your valued application assets, achieve seamless connections to higher level systems and subsystems, and provide a virtual environment for operator training.
Connectivity
Connections to higher-level systems and subsystems are an important consideration in the distributed control system (DCS) migration process. The CENTUM VP supports a variety of interfaces (e.g. OPC, PROFIBUS-DP, FOUNDATION™ fieldbus, HART) in its standard configuration. With proprietary interfaces and interfaces that are no longer standard (e.g. GP-IB and BSC), junction/conversion equipment is required. Yokogawa works with you to provide an optimal system configuration and integration service, taking your system migration requirements and interface standardization trends into full consideration.
Connections to higher-level systems and subsystems
Operator Training
It is desirable for operators to get used to operating the new system before the system migration. CENTUM VP provides an advanced virtual test function for that purpose. This not only makes it possible to virtually operate the system via an HMI, it also tests the control logic before the new system begins to operate. The quality of user-defined applications/logic can also be improved with this function. For instance, the logic for an abnormal situation can be tested easily using the virtual test function.
Engineering Capability
Yokogawa has experience in more than 340 third party system migration projects. Yokogawa can serve as the main contractor, providing a turnkey legacy system migration solution.
Requirements of migration projects
- Time-critical
- Minimize plant downtime while maintaining safety
- Miniminize reinvestment in plant assets
Yokogawa's approach
Up-front Risk Management
To ensure accuracy, the I/O list generated from the loop drawings is cross-checked with the following:
- P&ID
- Marshalling drawings
- Database downloaded from the existing DCS system
- Junction box drawings
- Cable schedule
A strong relationship based on mutual trust and respect is essential for dealing with any critical issues that are identified. The identification activities are carried out before/during/after the shutdown period. Critical cutover tasks are prepared, approved, and carried out together with the customer.
Hot Cutover / Cold Cutover
Yokogawa can effectively handle both hot and cold cutovers. For instance, a legacy system migration project including a central control room (CCR) renovation for a customer in the Middle East was accomplished in just 9 days. Originally 14 days had been scheduled for the shutdown. In addition to the 5 days that were saved through well-managed cutover work, 3 days were saved during the plant start-up phase. The completion of this project 8 days sooner than scheduled saved the customer US $6.7 million.
Conversion Tool for Legacy System Engineering Data
Software engineering information (e.g. tag numbers, units, ranges, comments, control schemes, alarm settings, tuning parameters, etc.) can be downloaded from an existing DCS system. The downloaded information can be then fed to the CENTUM VP using a conversion tool, saving considerable time and ensuring a reliable result.
Migration Engineering Workflow
Cost-effective Upgrade
Yokogawa has developed the necessary upgrade solutions so that your legacy Centum controllers and process interface units can be replaced with the newest CENTUM VP I/O and controllers, utilizing upgrade cards and adapter cables that connect to the existing terminal panels of your legacy system. No cabinets need to be rewired in the field, dramatically reducing process downtime. In fact, because of the compact design and the high density of the CENTUM VP I/O cards and controllers, fewer cabinets are required and space is freed up for other uses. We recognize that upgrading the controller and field hardware is only part of the risk management story. User applications and operator graphics constitutes a major part of work that can be very time-consuming. With most releases, the translation of control strategies and operator graphics happens automatically with 100% translation. Reports are generated to identify potential problem areas that need manual intervention or review. This allows for significant risk reduction for your upgrade project.
Yokogawa ensures an efficient and secure upgrade of your legacy system to the CENTUM VP, leveraging its field-proven engineering capabilities.
Yokogawa has supplied these solutions to customers around the world. They are delighted with their new CENTUM VP systems and are benefiting from increased reliability, lower Total Cost of Ownership, and lower operating risk.
Cumulative cash flow for master plan |
Basically, system migration should be regarded separately from ROI because it is a part of equipment maintenance. Our customers are now more focused on ensuring long-term survival by investing to increase productivity and seeking to minimize production losses. Similarly, customers are looking everywhere for ways to improve profits, even in system upgrade projects. Yokogawa believes that a system upgrade can be a very effective step forward in modernizing your plant, and offers a value-added system migration service to make this a reality.
The value-added upgrade process consists of the following phases:
- Feasibility study that analyzes the gap between targeted and actual results, identifies bottlenecks, proposes practical countermeasures, and estimates the resulting improvement in profits
- Implementation of system upgrade countermeasures
Yokogawa's experienced specialists are involved in all phases of this process.
Study area / item | Analysis | Benefit | |
---|---|---|---|
Innovative production system | MP |
|
|
Refinery modernization | MP |
|
|
Offsite modernization | FS |
|
|
Operation improvement | FS |
|
|
Advanced process control (APC) | FS |
|
|
Feasibility study (FS)/master plan (MP) for refining industry
Case Study - Yokogawa
Smurfit-Stone Container Corporation, USA |
To generate the maximum return with a minimum of investment and ensure that customers remain competitive, Yokogawa is providing solutions for the migration of legacy CENTUM V, CENTUM-XL and μXL DCS systems to new production control systems that employ the latest technologies.
Success Stories
Panama City Mill
Control System Upgrade
- Smooth conversion of existing controls solely by customer
- Lowered cost of ownership
General specification documents below are available at Yokogawa Plus. Please register to access these documents.
General Specifications: | |
---|---|
CENTUM V and CENTUM-XL Migration to CENTUM CS 3000 | GS 33Q06W30-31E |
Migrating to CENTUM CS 3000 from CENTUM V or CENTUM-XL Operator Station | GS 33Q06Z81-31E |
Migrating to CENTUM CS 3000 from mXL Operator Station | GS 33Q06Z82-31E |
μXL Operator Station Migration Kit for CENTUM CS 3000 Entry Class | GS 33Q06Z83-31E |
Phased Migration for the CENTUM V, CENTUM-XL
Phased migration for the CENTUM V, CENTUM-XL is a three-step upgrade method on a component basis, which reduces the required investment and manpower, and shortens the upgrade period.
Step 1: Upgrading of HMI
Upgrading of HMI brings in the latest HMI environment and network capability, surely one of the most important issues.
Step 2: Upgrading of CPU of FCS
By utilizing the existing field wiring and I/O cards, the latest control functions are provided, while greatly improving performance and application capacity.
Step3 : Upgrading of I/Os
Using existing field wiring, the latest I/Os are provided with full compatibility of functions, interface and cabinet layout.
Phased Migration for the μXL
Phased migration for the μXL is a two-step upgrade method on a component basis, which reduces the required investment and manpower, and shortens the upgrade period.
Step1 : Upgrading of HMI
Upgrading of HMI brings in the latest HMI environment and network capability, surely one of the most important issues.
Step2 : Upgrading of the control units
Using existing field wiring, the latest I/Os are provided with full compatibility of functions, interface and cabinet layout.
Recursos
Download this eBook and learn:
- The top challenges that drive reinstrumentation
- How to plan for and achieve a successful project
- Best practices in identifying your project scope
- 5 ways to improve operator effectiveness
- Different scenarios and best practices for updating, migrating or replacing process controls, safety systems, and instrumentation in plants
October 2008
The 2008 Frost & Sullivan Asia Pacific Company of the Year Award for Distributed Control System (DCS) market is presented to Yokogawa. Yokogawa is the market leader with a dominant market share in the Asia Pacific market.
¿En busca de información adicional sobre Yokogawa Iberia, tecnología y soluciones?
Contáctenos