- Location: Somerton, Victoria, Australia
- Output/fuel: 150MW (4×37MW), gas fired
- Owners: AGL Power Generation, Australia
- Overview: AGL Somerton Power Station is a peaking power station which provides Victoria with electricity in times of high electricity demand. The plant plays a significant role in ensuring the state's stable supply of electricity.
Project
Unified Operator Interface Solution
Enables Remote Operation /
AGL Somerton Power Station, Australia
- Operation date: 2002
- Project type: Greenfield site
- Plant configuration:
Gas turbines: 4 second hand Frame 6 gas turbines, manufactured under license to GE by Alstom and Thomassen International. - Overview: Electricity demand is growing rapidly in southern Australia and networks are reaching full capacity during peak demand periods.
Following a requirement for a new substation in its distribution network, AGL decided to build a peak power station in Somerton, Victoria. Yokogawa Australia provided system engineering, installation support, and commissioning services for the project.
(Customer requirements)
- Remote control and operation:
The plant owner needed to operate 4 gas turbines from an existing control center in Melbourne. - Fast track project:
The project schedule was very tight, with the plant needing to be in operation by the following summer (2002). This left just three months for the delivery of system equipment.
(Yokogawa's solution)
- Unified Operator Interface (UOI):
The CENTUM CS 3000 / UOI was selected for this project. The control platform in the UOI is the GE Fanuc CIMPLICITY Human Machine Interface (HMI) system, which fully integrates the controls for the turbine and BOP auxiliaries and uses the same screens/formats at both the turbine and BOP HMI displays. The CIMPLICITY HMI used in the UOI is a SCADA based design that fully supports the customer's requirement for remote operation capability. - On-time delivery:
IIn close cooperation with Yokogawa's factory in Singapore, Yokogawa Australia supplied fully engineered control systems on schedule.
System
- Control scope:
Interface to Triconex Turbine Controllers
Balance of Plant (BOP) Control
Interface to electricity market network (NEMMCO)for load dispatch
- System equipment:
CENTUM CS 3000 / UOI
업종
-
전력
1970년대 중반, Yokogawa는 EBS 전기 제어 시스템 (EBS Electric Control System)의 출시와 함께 전력 사업에 진출했습니다. 그 이후로 Yokogawa는 전 세계 고객에게 최상의 서비스와 솔루션을 제공하기 위한 기술과 역량의 개발을 꾸준히 지속해 왔습니다.
Yokogawa는 역동적인 글로벌 전력 시장에서 더욱 적극적인 역할을 수행하기 위해 글로벌 전력 솔루션 네트워크를 운영했습니다. 이로 인해 Yokogawa 내에서 보다 긴밀한 팀워크가 가능해져서 글로벌 리소스와 업계 노하우를 하나로 모았습니다. Yokogawa의 전력 산업 전문가들은 각 고객에게 정교한 요구 사항에 가장 적합한 솔루션을 제공하기 위해 협력합니다.
-
화력발전
석탄, 석유 또는 가스를 연료로 사용하는 화력발전은 전 세계적으로 대부분의 전력을 생산하고 있습니다.
Related Products & Solutions
-
Distributed Control System (DCS)
10,000개가 넘는 플랜트의 운영자는 매년 생산 목표를 달성하기 위해 Yokogawa의 DCS 기술과 솔루션을 신뢰합니다.