About Saudi Aramco and the Rabigh Refinery

Saudi Aramco Rabigh Refinery Control System Replacement (Hot Cutover) Saudi Aramco's operations span the globe and the energy industry. The world leader in crude oil production, Saudi Aramco also owns and operates an extensive network of refining and distribution facilities, and is responsible for gas processing and transportation installations that fuel Saudi Arabia's industrial sector. An array of international subsidiaries and joint ventures deliver crude oil and refined products to customers worldwide.

World-class refineries located across the country, from the Arabian Gulf to the Red Sea, reliably supply more than a million barrels of products each day to meet the needs of the Saudi Arabian and international markets. The Rabigh Refinery, located 160 kilometers north of Jeddah on the Rea Sea coast, is one such refinery operated by Saudi Aramco.

The Rabigh refinery has a 400,000 BPD crude topping facility. Crude is delivered by tankers through the Saudi Aramco Rabigh port. The main products are fuel oil, naphtha, and jet fuel. LPG and oil are used as fuel for the refinery while recovered sulphur is bagged and shipped.
https://japan.aramco.com/en/creating-value/services/projects/petro-rabigh

Background of This Project

Background of This Project

 

As part of an upgrade project to reap the benefits of the latest technology, Saudi Aramco Rabigh Refinery awarded Yokogawa this project to replace the existing control system with a state-of-the-art distributed control system (DCS). The entire complex was previously controlled by single loop controllers and a Foxboro IA system.

The decision to introduce the new system was motivated by the need to reduce the high maintenance costs of the single loop controllers and to obtain improved functionality. The selection criteria emphasized system reliability and the ability to replace the system while the plant was operational (hot cutover).

With SNC Lavalin Inc. as the design contractor and Carlo Gavazzi as the construction contractor, Yokogawa delivered the control system with the engineering assistance of its Middle East office in Bahrain.

In addition to the DCS, the project scope included the implementation of an oil blending system (OBS), multi-variable control (MVC), and heater pass balance control by Yokogawa Middle East. The OBS implementation is in progress while the MVC implementation was successfully completed in March 2007.Twenty existing and ten newly installed subsystem interfaces increased the complexity of the hot cutover and function test.

Team Effort Always Pays

According to the Saudi Aramco Project Management Team Lead Engineer, "One of the key factors leading to the smooth hot cutover was the team effort. Every activity was meticulously planned to ensure a safe change over. This was possible because everyone adhered to the procedures stipulated before the hot cutover was started by all the groups involved."

The major challenge was the integration of the subsystem interfaces. "We never felt the complexity of the integration work", said the Control System Engineer, "and this was possible since the integrated site acceptance test (ISAT) was so comprehensive."

Hot Cutover Challenges

The major challenges were winning the operators' acceptance of the new system, scheduling and coordinating the ISAT with all the subvendors, and quickly troubleshooting the problems encountered during the hot cutover.

Pre and post hot cutover planning was done in several meetings between Saudi Aramco, SNC Lavalin, Carlo Gavazzi, and Yokogawa Middle East. Various check sheets and procedures were in place for the tuning of loops and the final handover.

What This Project Achieved

  1. A smooth and safe switchover to the new system
  2. An easy-to-use, easy-to-engineer system, plus various post-installation enhancements
  3. Tuned controllers for smooth plant operation and better traceability of process upsets
  4. Various other improvements thanks to advanced process control and MVC implementation

What's Next?

Having successfully completed the control system replacement project, Yokogawa was awarded the Saudi Aramco - Sumitomo Joint Venture, PETRORabigh project to engineer and install the CS 3000 DCS for a huge petrochemical complex that is being built next to the refinery.

SYSTEM DETAILS

Control system: CENTUM CS 3000 R3
Number of I/O points: 5000
System configuration  
No. of domains: 06
Engineering stations (ENG): 02
Human Interface Stations (HIS): 14
Field Control Stations (FCS): 12
EXAOPC: 01
Plant Resource Manager (PRM): 01

업종

  • 오일 및 가스관련 다운스트림

    석유 및 가스 산업은 최근 몇 년간 어려움이 커지고 있습니다. 여기에는 처리할 원료의 변화하는 특성, 공정 설비 및 장비의 고령화, 에너지 비용의 상승, 정유 공장을 안전하고 효율적으로 운영할 수 있는 숙련 된 플랜트 운영자의 부족, 그리고 시장과 시장의 끊임없이 변화하는 요구 사항이 포함됩니다.

    지난 수년간 Yokogawa와는 많은 어려움을 겪고 있는 산업 솔루션을 제공하기 위해 여러 다운스트림 회사와 파트너 관계를 맺어 왔습니다. Yokogawa의 VigilantPlant 솔루션은 플랜트 소유자가 플랜트 내에서 최대한의 수익성과 지속 가능한 안전을 달성하도록 도왔습니다.

    See More
  • 정유

    끊임없이 변화하는 시장에서 정유설비는 원유 처리 장치뿐만 아니라 이익센터로도 인식됩니다. 동시에 그러한 시설에서 안전의 필요성에 대한 각별한 인식이 있습니다. 계획, 스케줄링, 관리 및 제어를 포함하는 총 생산 솔루션은 수익성, 효율성 및 환경 보호를 위한 장기 목표를 달성하는 데 필요합니다. Yokogawa는 자동화 분야에서 수년간 축적 된 전문성을 바탕으로 보다 향상된 작업성 및 보다 깨끗한 세상을위한 효율적인 솔루션을 제공합니다.

    See More

Related Products & Solutions

  • CENTUM OPC Server (Exaopc)

    Exaopc는 data access (DA), alarms & events (A & E), historical data access (HDA) 및 Batch 정보를 위한 고성능 및 신뢰할 수 있는 OPC 서버로서의 기능을 수행하며 CENTUM 시리즈 공정 제어 시스템의 보안 인터페이스 역할도 합니다.

    See More
  • DCS Migration / Replacement

    변화하는 프로세스의 요구 사항을 충족할 수 있도록 설계된 DCS 마이그레이션 서비스를 통해 '미래 지향적인' 시스템으로 전환하세요.

    See More
  • Plant Resource Manager (PRM)

    신뢰성 높고 안정적인 플랜트 운영을 위해 설비를 제대로 관리하고 계신가요? PRM은 플랜트 수명 주기 전반에 걸쳐 유지보수 계획의 품질을 개선하고 유지보수 비용을 최적화하는 데 기여합니다.

    See More
  • 컷오버 계획 및 실행

    신중한 계획과 실행을 통해 요꼬가와는 고객의 시스템을 안전과 합리적인 비용, 가치를 더한 마이그레이션 프로세스를 실현 할 수 있도록 도와줍니다.

     