Check the active power. If the active power turns negative or extremely small, check the items below. The active power is negative when the power is regenerating.
Items to check
- Is the CT attachment orientation correct?
- Is a CT connected to the R and T phases?
- Is the R phase CT connected to 1S and 1L, and is the T phase CT connected to 3S and SL? Also check the polarity (k, l) on the CT secondary side.
- Are R, S, and T wired to P1, P2, and P3?
Check the wiring and attachment for other phase and wiring schemes as well.
Related Products & Solutions
-
Power monitoring package SMARTDAC+ GM / UPM100
Power monitoring package SMARTDAC+ GM/UPM100 is a data collection system for energy saving monitoring consisting of 920 MHz compatible power monitor UPM 100 and data acquisition system GM. Easily visualize the electric power used in the factory (graph) and create reports, etc. We can help waste energy by finding waste of electricity used.
-
PR201 Power Monitors
The PR201 Power Monitors was discontinued on 1/01/2006. The PR300 is a replacement product.
-
UPM01
Model Name: UPM01
-
UPM02
Model Name: UPM02
-
UPM03
Model Name: UPM03
-
UPM100/UPM101
UPM100 / UPM101 is a compact power monitor that can measure 15 items such as electricity energy with 1 unit.
-
UZ002
Model Name: UZ002
-
UZ003
Model Name: UZ003
-
UZ005 Power Monitors
The UZ005 Power Monitors was discontinued on 9/01/2006. The PR300 is a replacement product.
-
UZ008
Model Name: UZ008