Establishing an Environmental Load Management System for Factories

下载 (1.2 MB)

Takane Misawa1 Masao Yanagimori2 Satoru Isobe3

Mercian Corporation has established an environmental load management system at its Yatsushiro Factory by using Yokogawa's Enerize factory energy management system. The system is intended to manage data not only on energy consumption but also on the environment relating to production activities such as the amount of water consumed in the factory. This paper describes the successful introduction of this system.

  1. Registered Energy Manager, Production Dept. Production Headquarter, Mercian Corporation
  2. Registered Energy Manager, Facilities Institution Section Yatsushiro Plant, Mercian Corporation
  3. Green Factory Solutions Business Center, Industrial Automation Business Headquarters

INTRODUCTION

As a company that has strong relationship with nature and provides products using nature's blessings, Mercian Corporation is committed to the environment. Its environmental philosophy is "Mercian thanks nature's blessings and capability that sustain life, and seeks to balance environmental preservation with creating an affluent society." To create a sustainable society, the company strives to conserve resources and energy, develop environment-friendly products, disclose information regarding environmental impact, and comply with laws. This paper describes the environmental load management system which was established at Yatsushiro Factory, one of Mercian's largest production bases, with Yokogawa's Enerize factory energy management system for factories.

MID- AND LONG-TERM ENVIRONMENTAL GOALS AND OBJECTIVES OF THIS SYSTEM

Mercian recognizes that business activities inevitably impact on the environmental load. To fulfill its responsibility for maintaining the environment and creating a sustainable society, the company has set the following mid-term targets, based on its philosophy and management policy on the environment1.

Target 1: Reducing CO2 emissions caused by energy consumption
Factories: Reducing emissions by 7% in FY2012 compared with FY2002
Logistics: Reducing emissions below those in FY2004

Target 2: Reducing the use of water for manufacturing
Reducing usage by 20% in FY2012 compared with FY2002

Target 3: Reducing waste
Reducing the amount below that in FY2004

Target 4: Reducing the emissions of substances designated in the pollutant release and transfer register (PRTR) system
Reducing the emissions to 1/5 of those in FY2002 in FY2012

Target 5: Reducing the environmental load caused by containers and wrappings for liquors
Reducing their weight per capacity below those in FY2002

When building the environmental load management system, we concentrated on the management and reduction of CO2 emissions (target 1) and water for manufacturing (target 2) among these targets.

Table 1 shows the CO2 emissions and use of water for manufacturing by each production base in FY20081. The CO2 emissions due to energy consumption and use of water across the company increased by 3.6% and 6.5%, respectively, compared with FY2002. As shown in the table, Yatsushiro Factor y, which is the target of the management system, produces various items and thus emits more CO2 and uses more water than other factories. Therefore, we put priority on these reductions in the factory than in other factories.

Table 1 CO2 emissions and use of water for manufacturing by each production base

Production base Main products CO2 emission [t] Use of water for manufacturing [kt]
Tomakomai factory Cattle feed 4,766 15
Nikko factory Rice wine, seasonings, drug products, others 4,665 487
Fujisawa factory Wine, others 6,579 237
Katsunuma winery Wine 347 77
Iwata factory Medicine and chemicals 6,394 1227
Uwajima factory Fishery feed 1,087 10
Yatsushiro Factory Shochu (Japanese distilled clear liquor), medicine, chemicals, others 92,292 6,789

ISSUES FOUND IN YATSOSHIRO FACTORY

Figure-1-Previous-Flow-of-Operations-from-Collecting
Figure 1 Previous Flow of Operations from Collecting to Announcing Environmental Data

Issues in Yatsushiro Factory

  1. Increased tasks regarding environmental management
    Including compliance with the Revised Energy Saving Act enforced in 2010, tasks related to environmental management are tending to increase at the company level as well as in each factory. Figure 1 shows the previous flow of operations in respective factories from collecting environmental data to announcing them. The review and implementation of measures for energy conservation and environment preservation were not included.
    As shown in Figure 1, the previous workflow started with collecting data from the reports created by the control systems for utility facilities such as electric power, steam, and air-conditioning, and the measured data by visual reading of the field instruments at the end of every month. These data were then transferred manually into Excel worksheets for calculation and reporting. When any equipment or management organization was changed, the content of worksheets had to be adjusted accordingly and the calculation performed again. Reports were then created showing the energy cost for each organization and aggregation or allocation of energy and water to and from each organization and production line. It took about 20 man-days a month to perform this work, which reduced the time available for other activities including actually taking energy-saving measures. As a result, the management operations, which should have been carried out according to the PDCA cycle, were done only for collecting and reporting data.
  2. Information ownership
    Yatsushiro Factory is an old production base which started up in the 1940s, so it has repeatedly reorganized and upgraded its production facilities. The worksheets for calculation and reporting used in the work described above have been revised by successive Registered Energy Managers to reflect such reorganization. However, we could not find detailed records on the reasons for revisions; in the past, only the people in charge possessed such information.

Targets in Solving the Problems

To solve the problems and improve the efficiency, we set the following targets for the new system.

  • Reducing workloads 
  • Creating a calculation tool well suited to the present configuration and a system that can easily handle the reorganization and innovation of factory facilities in the future
  • Clearly showing the energy consumed per unit production by each product and production line to establish the PDCA cycle

To solve the problems on the site and encourage the PDCA cycle to be carried out, it is necessary to identify inefficient areas of the factory. To do this, it is necessary to visualize the site timely, define key performance indicators (KPI) which shows the status of products and production lines and can be used for decision making, and manage them based on the indicators. As the Indicators (KPI), we have adopted the energy consumption per each product by production line and facility. We decided to measure the indicators, set new targets of the indicators utilizing the measured values, and build an environment to support the daily PDCA cycle.

BUILDING THE ENVIRONMENTAL LOAD MANAGEMENT SYSTEM

To achieve the goals, we built an environmental load management system at the Yatsushiro Factory based on Yokogawa's Enerize factory energy management system.

Procedures to Build the System

Figure 2 outlines the flow to build the system.

Figure-2-Outline-of-the-flow-to-build-the-system 
Figure 2 Outline of the flow to build the system

The detailed procedures to build the system are as follows.

  1. Figure-3-Energy-flow 
    Figure 3 Energy flow
    Creating a list of measurement points
    A list of measurement points was created as follows.
    • Determining appropriate measurement items by examining existing system specifications such as electric power system diagrams and steam piping diagrams, existing Excel worksheets for managing and calculating the data, information on existing management reports, and the production sites
    • Checking the appropriateness of extracted measurement items by referring to the information that must be included in the report or management
    • Defining properties for each measurement item, including types of energy, location information (building, floor, line, process, and equipment), and usage, then arranging them as a list of measurement points
  2. Creating the energy flow
    Based on the electric power system diagrams, steam piping diagrams, and existing Excel worksheets for managing and calculating the data, the energy flow was created by using Visual Builder of Enerize, and the relations between respective measurement points and equipment were defined and arranged.
    Figure 3 shows the energy flow created by this work. This allows everyone to easily know the energy balance of the factory. This energy flow includes about 500 measurement points and about 2,000 steps related to converting to energy equivalent, CO2 equivalent, and cost equivalent in 14 sheets.
  3. Figure-4-Definition-of-organization-allocation-data
    Figure 4 Definition of organization, allocation data, and allocation ratio
    Arranging and defining allocating information for each department
    The rules for allocating energy consumption to each department were defined based on information on the existing worksheets for calculating and managing the data. As shown in Figure 4, this information was defined in terms of organization, data to be allocated, and allocation ratio by using Visual Builder of Enerize.
  4. From definition of user tasks to definition of Human Machine Interface (HMI)
    The most important requirement when building the system is its operational requirements. However excellent the system is, its usefulness depends on how it is used. Since Enerize can define the configuration of screens depending on the flow of user operations and counter measures for difficulties, we could define the development menu of HMI while arranging the flow and purpose of the user tasks.

Total System Configuration

Figure 5 shows the system configuration and other systems.

 Figure-5-Total-System-Configuration

Figure 5 Total System Configuration

Yokogawa's CENTUM CS3000 and TriFellow are used for the boiler control system and power relating facilities monitoring system. PLCs are used to control and monitor the electricity relating facilities and production facilities in the factory. These systems, PLCs and Enerize are connected through the OLE for process control (OPC) interface, and Enerize collects data periodically.

Data is sent to client PCs via a Web server. To ensure security, it is preferable to build an independent LAN between client PCs and the Web server, as well as between the Web server and data collecting systems such as Enerize. However, constructing a LAN over a wide area would require major work, so we compromised to use the existing in-house LAN and built a virtual local area network (VLAN) by installing routers for restricting unauthorized access to areas that need strict security. To do this, we worked closely with Mercian's in-house information service department.

Mercian's original per unit production management system and Enerize are connected through the file interface. The system accumulates and manages the information for energy per unit production generated by Enerize based on information such as manufacturing items, production lines, production quantities, and start and completion times of each manufacturing lot.

Overview of System Functions

Figure-6-System-Functions-and-Flow-of-the-Data

Figure 6 System Functions and Flow of the Data

Figure 6 shows the functions of the environmental load management system and the flow of the data. The main functions are summarized below.

  • Collecting data:
    Data is collected with the time stamp every minute through the OPC interface.
  • Calculating following energy models:
    Total energy costs, costs in supplying one energy unit, and CO2 emission at each measurement point are calculated following the energy flow defined by Visual Builder by using calorific values converted from measured raw data. Coefficients of performance (COP), calorific energy loss, and cost loss of each energy conversion equipment are also calculated.
  • Closing:
    Maximum, minimum, average, and total values, and the number of counting are calculated for the measured or calculated data. The hourly, daily, monthly, and yearly closing calculations are performed.
  • Allocation:
    Specified data is allocated based on an allocation table, which is defined by using the occupying area and rated values of each equipment.
  • Summing up for each category:
  • Total values for each category are summed up based on the defined tree structure (hierarchy of organizations and processes).
  • Designing and displaying graphs:
    Various graphs are designed and assigned to be displayed simultaneously with the management criteria. These graphs can be displayed respectively by calling up their name.
  • Designing and displaying images by HTTP:
    Screen images are designed using the Hyper Text Transfer Protocol (HTTP) format to show the screens registered for Web browsing on any PCs connected to the in-house LAN. Internet Explorer is used to display them.

RESULTS AND EXPECTED EFFECTS OF THESE ACTIVITIES

The results and expected effects of these activities are as follows.

  1. Improving the efficiency of management operations
    Workloads for compliance with regulations such as the Revised Energy Saving Act tend to increase. As mentioned in the "Issues in Yatsushiro Factory" section, many man-hours were needed merely to create reports. The new system reduced the time required for management work to just 20%. This is because each operation such as collecting data and converting raw measurements to CO2 emissions, costs, and energy consumption is now carried out automatically. The man-hours thus made available can be used for preventive maintenance and improvement activities to improve productivity.
  2. All members are Registered Energy Managers.
    Previously, only Registered Energy Managers were engaged in environmental preservation and energy conservation activities. This new system can presents clear indicators for energy and water (per unit production), and thus helps all members involved in production to be aware of energy consumption.
  3. Preventing ownership by limited people
    Through building this system, we organized measuring items and energy flow related to the target equipment and clearly wrote down them as the correct information reflecting the actual status of the factories. The information previously belonged to limited people was made public, and that increased the degree of information sharing and created an environment where all members can utilize it. Especially, worksheets for data calculation were changed so easy by the energy flow as every one, not just the author, can understand.

CONCLUSION

Companies must comply with increasing management requirements such as the Revised Energy Saving Act, ISO14000, and ISO50001. Moreover, they need to respond to the carbon footprint system that requires marking for CO2 emissions. Thus, the circumstance of companies' environment- oriented management is becoming more severe. We expect this approach in Yatsushiro Factory can be deployed to other Mercian's manufacturing bases, thus promoting beneficial environmental management throughout the company.

REFERENCES

  1. Mercian Corporation, "CSR report 2008/2009," http://www.mercian.co.jp/company/eco/pdf.html
  • CENTUM, Enerize, TriFellow, and Exaopc are registered trademarks of Yokogawa Electric Corporation.
  • Excel and Internet Explorer are registered trademarks of Microsoft Corporation.

行业

  • 地热发电

    地热能不受天气条件的影响,整年都能进行稳定的电力供应。此外,由于没有燃料在地面上燃烧,并且只释放出极少量的二氧化碳,因此环保性非常高。沿着环太平洋带(也称为“太平洋火圈”),在日本、菲律宾、印度尼西亚、新西兰、墨西哥、哥斯达黎加和美国等国家以及位于其他地热活动区域的冰岛、土耳其和意大利等国家都有丰富的地热资源。截至目前,横河已在日本、东南亚等地参与了30个地热发电项目,提供了多种测量和控制技术,提高了地热发电系统的可靠性和维护效率。

    更多
  • 大宗石油化工

    无论是生产石化产品、无机物还是中间产品,化工企业都面临着成本和利润率的压力,必须及时有效地交付产品,同时保持安全、合规地运营。此外,化工企业必须应对原料和能源价格的波动,并为市场提供适合的产品组合。

    横河电机长期服务于大宗化工市场,得到大家的广泛认可。通过我们的产品、解决方案和行业专业知识,横河了解您的市场和生产需求,并将与您合作,在您的工厂生命周期中提供可靠、经济的解决方案。

    更多
  • 水和废水

    横河电机通过开发更节能的技术,帮助减少运营的碳排放,以及构建保护环境免受污染的坚固建筑,为可持续水生产提供控制解决方案。横河凭借先进的技术和广泛的应用专业知识与客户合作,提供可持续水生产的解决方案,促进客户的业务,并让整个工厂在生命周期中增加效用。横河的技术和产品可提高工厂的性能,确保它们在当今的水处理领域中具有竞争力,并降低运营成本。横河支持市政和工业水处理领域的各种水控制方面的应用。

    更多
  • 生物质发电

    现在生物质受到越来越多的关注,因为它是一种可再生能源,可以帮助火力发电厂减少二氧化碳排放。横河电机的系统在多种类型的发电厂中都有使用,包括使用生物质发电的工厂。横河电机的测量和控制技术帮助这些工厂更有效地运行并减少其碳排放。

    更多
  • 电力

    在20世纪70年代中期,横河电机发布EBS电子控制系统,从而正式进入电力行业。从那时起,横河电机一直坚持不断发展技术和能力,旨在为客户提供更好的服务和解决方案。

    横河电机凭借着电力解决方案网络,在充满活力的电力市场中发挥着积极的作用。通过结合资源和行业知识,使得团队合作更加紧密。横河电机的电力专业人员们将携手合作,为客户提供适合其复杂要求的解决方案。

    更多

相关产品&解决方案

  • 集散控制系统(DCS)

    横河电机的集散控制系统(DCS) 可实现工业过程的自动化和控制,并提高业务绩效。30,000多套系统的经营者选择采用横河电机的DCS来实现其生产目标。

    更多

置顶
WeChat QR Code
横河电机(中国)有限公司