Italian Waste to Energy Plant Turns to CENTUM CS 3000, PRM, and FOUNDATION™ fieldbus Solution

HERAmbiente logo
下载 (644 KB)

Executive Summary

HERAmbiente, Ferrara, Italy
HERAmbiente, Ferrara, Italy

Founded in 2009, Herambiente is Italy's largest waste disposal company. The company operates a total of 80 facilities that dispose of a combined total of 5.1 million tons of municipal and industrial waste each year. These include 7 waste to energy (WTE) facilities that generate over 600 GWh of electricity and 160 GWh of thermal energy each year. All of these facilities are ISO 14001 certified and over a third are registered under the Eco-Management and Audit Scheme (EMAS). The company provides its customers a complete range of alternatives such as incineration, composting, selection, chemical treatment, and landfill disposal, as well as integrated environmental decontamination services.

Herambiente's WTE plant in the city of Ferrara has been operational since 1993, and receives waste from the urban area and the surrounding province. The plant began with a single WTE line capable of handling 150 tons of waste per day, and two additional WTE lines were started up in 2007 and 2008 that gave the plant a 400 tons per day capacity. The heat recovered from the waste combustion process is used to produce steam that is used to generate 14 MW of electricity. Depending on seasonal demand levels, heat from this process is diverted to a dedicated heat exchanger that transfers an additional 30 MW of thermal energy as steam and hot water via a district heating system to the private residences in the local community. Other major sources of thermal energy for this network are two geothermal wells and a natural gas-fired thermal power station with seven boilers.

As part of the upgrade and expansion of the facilities at the Ferrara WTE plant, Yokogawa provided a turnkey solution that included the CENTUM CS 3000 control system, FOUNDATION™ fieldbus enabled instrumentation, and audio IP(internet protocol) and CCTV(closed-circuit television) systems. Also, under the terms of a six-year contract, Yokogawa is providing ongoing maintenance services.

How a waste-to-energy plant works

The Challenges and the Solutions

1. Achieving steady operation
This WTE plant is relied on by the residents of the city of Ferrara and the province of the same name to provide a stable supply of heat and electricity throughout the year, with the exception of a one week period where the plant is shut down for maintenance. Helping to make this happen are Yokogawa's instrumentation solutions. This begins with the initial processing of municipal waste that is trucked to the facility, accurately weighed, and loaded by a crane into the incinerator. From their CENTUM human machine interface (HMI) stations in the central control room, operators are able to monitor every stage of this process by means of a MODBUS link to field devices and controllers.

The controls for the incinerator and boilers are all configured in the CENTUM CS 3000 system, ensuring the optimum execution of all processes, including incinerator startup. Here, natural gas burners operate to gradually bring the incinerator up to 850 deg C, whereupon the burners are shut down and a stoker begins feeding waste to the incinerator for sustained operation. All of these sequential procedures are automated by the rich functions of CENTUM CS 3000. The operation of the steam turbine, district air conditioning/heating, and emissions monitoring systems is also integrated with the CENTUM CS 3000 system. By scanning graphic displays that show trend data, operators are able to continually stay on top of processes throughout the plant on a real-time basis. When the main power supply is not available for some reason, the CENTUM CS 3000 system will also control the process by a UPS(uninterrupted power supply) and a diesel generator to provide backup power to the plant, ensuring uninterrupted operation year-round.

DCS-HMI stations in central control room

DCS-HMI stations in central control room

Crane operator

Crane operator

2. Enabling a predictive maintenance
Nearly 1,500 FOUNDATION fieldbus devices are monitored and managed using the PRM plant resource management package. Working from an engineering workstation in the central control room, engineers can check the current status of each device and modify device parameters whenever required. This reduces the need for manual checks of the devices and enables a predictive maintenance approach.

Engineering workstations

Engineering workstations

Customer Satisfaction

Plant Manager Andrea Carletti: "We are very proud of our facility and the role it plays in providing a sustainable source of energy to Ferrara city and its province. Helping to make this happen is Yokogawa's CENTUM CS 3000 system, which has operated smoothly with no major problems since it became operational in 2008."

"Our integrated system manages all processes in the Ferrara plant, from the reception of waste to the treatment of ash, from the treatment of gases from combustion to monitoring emission, from electricity production to heat production for district heating. All technical and environmental data of Ferrara plant are monitored by an integrated control system that is common to all the energy plants of the group by using a central control room. This gives the possibility to control from each remote station, the operation of each connected system. The aim of Hera group is to remotely monitor all its plants, not only waste to energy power plant. That system will be the largest in Europe. This permit to help the Hera group to achieve a higher level of efficiency in the near future."

Andrea Carletti, Plant manager
Andrea Carletti
Plant manager

For further information

Renewable Energy:
Waste to Energy

Products & Solutions:
CENTUM (Production Control Systems)
 PRM (Plant Asset Management)
 FOUNDATION fieldbus (Field Digital Solutions)

行业

  • 可再生能源

    使用可再生能源可以保护环境,使社会和工业更接近实现可持续性发展的目标。然而与传统能源相比,在其快速发展的道路上存在着一些阻碍,如生产成本较高、电网供电不稳定等。作为控制系统和仪表行业的企业,横河电机一直致力于帮助各行业客户实现稳定运营、提高工厂生产效率。基于VigilantPlant实现平稳运营的理念,横河电机的解决方案可促进可再生能源的使用。

    更多
  • 垃圾发电

    垃圾处理在城市地区面临着日益严峻的挑战。垃圾发电(WTE)技术为这一问题提供了环保的解决方案,同时满足了对替代能源日益增长的需求。有一百多个垃圾发电厂和其他类型的垃圾焚烧设施使用横河电机的控制系统解决方案。因此,横河电机的测量和控制技术在使我们的家园更清洁、更高效方面发挥着关键的基础设施作用。

    更多
  • 电力

    在20世纪70年代中期,横河电机发布EBS电子控制系统,从而正式进入电力行业。从那时起,横河电机一直坚持不断发展技术和能力,旨在为客户提供更好的服务和解决方案。

    横河电机凭借着电力解决方案网络,在充满活力的电力市场中发挥着积极的作用。通过结合资源和行业知识,使得团队合作更加紧密。横河电机的电力专业人员们将携手合作,为客户提供适合其复杂要求的解决方案。

    更多

相关产品&解决方案

  • 工厂资源管理系统(PRM)

    工厂资源管理系统(PRM)是横河电机用于资产管理的一个关键平台。该平台旨在改进操作和维护,通过获得更大的可预测性,使工厂资产的可靠性和可用性增强。

    更多
  • 闭路电视 (CCTV)

    这款紧凑、高性能、防爆的监控摄像头,体现了横河电机致力于制造能够承受恶劣环境的可靠现场仪器的承诺。

    更多

置顶
WeChat QR Code
横河电机(中国)有限公司