Migration of a refinery's DCS provided an opportunity to reconfigure and consolidate the control rooms and operational management system
Eric Jan Kwekkeboom
Yokogawa Europe & Africa
The consolidation of control rooms was conducted in several refineries in the 1990s and early 2000s as a means of reducing the number of operators and improving efficiency for enhanced competitiveness. The characteristics of consolidated control rooms vary, reflecting the history of a refinery. However, the adverse business environment in recent times has meant that the oil industry has had to consider approaches other than consolidation. In many plants, migration of the distributed control system (DCS) gives an opportunity to investigate the control room configuration and operational management system for achieving safer, more stable and more efficient operation.
This article describes refinery modernisation activities that led towards an ideal refinery that enables safe, stable and efficient operation. In the example described, Yokogawa was asked to contribute to a major part of the modernisation relating to DCS migration and control room consolidation. Yokogawa offered the Refinery Operation Modernisation Service, one of its VigilantPlant Services, which features four solutions: consolidated refinery production control including consolidated control room design; operator training system (OTS); capture and amalgamation of best practices (SOPs); and safety instrumented system (SIS).
Major issues for modernisation
Over the years, the refiner had upgraded its units one by one, with the aim of creating a high-conversion refinery, and the operations department had also been expanded to as many as six operating sections responsible for each unit. In all, the refinery had four distributed control rooms and DCSs acting independently. The control systems were supplied by two vendors and were of several generations, because they had been introduced as process installations. This presented several challenges:
- The detailed design of the DCS varied among the different operations sections
- Each operations section had its own operational procedures
- There was a lack of communication between operations sections since they mainly relied on information carried through instrumentation signal cables or via the supervisory information system
- The CPU utilisation rate and the number of instruments to be handled by each DCS were approaching allowable limits due to the repeated expansion and modification of process units
- The segmented organisation resulted in differing requirements for the education and training of operators, different spare parts for the DCSs, and different procedures for the maintenance engineers.
To solve these problems and to more actively achieve safer and more efficient operation of the refinery, and to transfer the knowledge of veteran operators, the refinery decided to combine the processes of consolidating the production organisation and control rooms with the migration of the production control system to the latest one.
Activities towards an ideal refinery
The refinery authorised a phased plan towards an ideal refinery to meet the demographic challenges presented by knowledgeable veterans retiring and their places being taken by less experienced personnel, with a target date of 2013 (see Figure 1). In Phase 1, the consolidation of control rooms and the migration of the production control system were scheduled to be completed in June 2009. After the physical migration, organisational re-engineering was planned, as Phase 2, to establish the "consolidated operation centre" by 2011.
This project was triggered by a report by a business improvement working group to the refinery's top management in 2004. Until the formal launch of the project in 2007, the control room consolidation working group in the refinery identified the issues involved for safe, stable and efficient operation, as well as the training of younger operators for knowledge transfer. During this preparation phase, Yokogawa proposed a visual concept of an ideal refinery and the human-centred configuration of the consolidated control room, including its migration plan, in collaboration with the refiner's working group. In Phase 1 of the project, named the control room consolidation project, Yokogawa undertook the migration work including control room design.
Control room consolidation project
The refinery was operated by six sections: the on-site plant sections 1-4, the power and utilities section, and the offsite section, distributed in four control rooms. The initial study concluded that the control rooms should be consolidated into one by constructing a new control room, and that the control systems should be migrated, taking the opportunity of a large turnaround scheduled for June 2009. The planned DCS migration was not a simple replacement of each existing DCS system, but introduced a supervisory DCS that could control and monitor the whole plant. It also included implementation of the consolidated safety instrumented system (SIS) to enhance the safety of the entire plant.
Figure 1 Activities toward an ideal refinery
The main purposes of the control room consolidation and the system migration are as follows:
- Enhance agility and co-operativeness in the refinery, and enhance the integrity of information systems throughout the supply chain, from plant operation to shipping
- Improve safety and establish a more efficient operation by systematic operator training to retain operational expertise, capturing operational procedures and amalgamating the derived best practices as improved standard operational procedures
- Prepare the environment for the above two major aims by constructing a new consolidated control room and a new system, thus establishing operational integrity.
Yokogawa proposed the following basic design policies for the system to achieve these purposes defined by the refiner:
- The consolidated refinery production control system: this includes not only the consolidation of control rooms and the migration of the control system planned in Phase 1, but also further system enhancement for improving plant operation and for operator training scheduled in Phase 2, implemented in 2011
- Highly efficient operation
- Safety management
- Refinery-wide operation: in the near future, refinery operation will be integrated into one unit, from crude processing to product shipping
- Operator training for sharing and improving operational expertise: the same DCS information is available everywhere in the refinery, in meeting rooms, in the field and in the office. Operational assistance systems are standardised
- High availability of the systems: the intention is to improve availability of each device, network and piece of software by designing the systems with full consideration of systems operation and maintenance.
Project implementation
Yokogawa proposed the Refinery Operation Modernisation Service to solve the various issues in the refinery. It consists of four solutions: the consolidated refinery production control system; consolidated control room design; OTS; and SIS for the refinery.
The proposed consolidated refinery production control system utilises the full functions of Centum VP, Yokogawa's latest integrated production control system. The system can realise efficient refinery operation in a consolidated control room by covering a broad range of plant areas and by incorporating many applications such as advanced process control, operation assistance, alarm analysis and SISs (see Figures 2 and 3).
The human-machine interface (HMI) for the consolidated control system was configured by utilising the HMI technology of the Centum VP. The new HMI can contribute to safe, stable and efficient operation in the following ways:
- Improved operability by adopting a multi-window function
- Integrated operation of multiple systems—including DCS, SIS, advanced process control system, operation assistance system, alarm analysis system, and supervisory emergency shutdown system —using integrated terminal functions
- Custom-designed furniture for comfortable operation and dual monitoring displays for sufficient information
- Reduced noise because of the fanless housing design
- Dedicated operational HMI console for temporary use
- A space-saving layout by adopting portable HMI consoles that are online detachable from the DCS bus.
Refinery-wide DCS bus and supervisory DCS
The supervisory DCS is installed on top of each unit DCS that collects refinery-wide data, such as utility data through the refinery-wide DCS bus, and monitors the performance of the refinery. The supervisory DCS also has a refinery-wide control function such as utility balance, and plant manipulations can be carried out through local DCS HMI.
In the future, this supervisory DCS will play an important role for total production management of the refinery, from crude processing to product shipping.
Figure 2 Overview of the consolidated refinery production control system
Large channel capacity and high-speed DCS bus
The consolidation of multiple large systems such as the total refinery system without losing information was achieved by a high-speed network. Yokogawa provides the Vnet/IP large channel-capacity DCS bus, which eases the restrictions on data communication between devices and systems.
DCS everywhere using a ubiquitous LAN
Figure 3 Illustration of consolidated control room concept |
The terminal service function of the Centum VP provides an environment for remote viewing of DCS screens. All the information in the DCS is visible in real time from anywhere in the refinery, whether in meeting rooms or at individual desks in offices, through the ubiquitous LAN. This helps to transfer operational expertise and develop human resources. Standardising and improving operation methods In the course of the system consolidation, existing different system specifications must be consolidated into one standard set of specifications. These include specifications for applications and HMI. In standardising the system interface, operation procedures were also reviewed and improved by applying enhanced standard operating procedures (SOP) for eventual standardisation and as such ready for further evolution, thus providing an environment for transferring expertise and continuous improvement of operator skills.
Ease of maintenance
Large-scale complex systems require vigilant design to improve integrity and availability. Highreliability design policies including redundancy, duplication and quick system recovery are adopted. In addition, remote maintenance enables problems to be detected and solved at an early stage, leading to stable operation.
Human-centred design for consolidated control room
For the new consolidated control room, Yokogawa designed the layout, lighting and acoustic systems, taking into account ergonomic factors such as operability, workability, visibility and comfort. The control room layout also takes such factors as communication between sections and future expandability into consideration. As a result, the new control room is human-centred in terms of both comfort and vigilance (see Figure 3).
Operator training system
In 2008, the refinery introduced a new type of fluid catalytic cracker as its second unit. The new unit was very different from the existing one in operation, and so the refinery decided to introduce an OTS to ensure a quick start-up. The OTS was configured by combining Yokogawa's OmegaLand dynamic simulator alongside the DCS. Moreover, since the existing DCS was migrated to the latest version of Centum VP accompanied by the consolidation of control rooms, the OTS was also used for operator training of the new operation screens for the consolidated refinery production control system. This reduced the risk involved changing a DCS vendor and enabled quick start-up of the new DCS.
The OTS was set up in the newly constructed training room, and a new system for the crude distillation unit (CDU) was also developed to transfer the expertise of veteran operators.
Safety instrumented system
Taking the opportunity of DCS migration, the consolidated SIS was installed to enhance the safety of the entire refinery. The existing emergency shutdown (ESD) system using a conventional relay system was replaced with the SIL3-certified ProSafe-RS safety instrumented system, which meets all requirements covered by IEC 61508/JIS C 0508.
The SIS is part of the core infrastructure of the consolidated refinery production control system for safe and efficient operation (see Figure 4). The system can also be integrated with the DCS and ESD triggers, and events can be seen on the same HMI of the DCS. Emergency responses can be carried out on the HMI display of the DCS along with the new ESD console.
The reliability of the ESD system has been improved by the following features of ProSafe-RS:
- Diagnosis of the entire path from a system I/O card to emergency shutdown valves without obstacles such as hard relays
- Diagnosis of wiring from ESD contact signals including pressure switches
- Partial stroke test of emergency shutdown valves.
ProSafe-RS is not a simple replacement of a relay-based SIS distributed throughout the refinery, but a refinery-wide SIS that will also provide simultaneous emergency shutdown of the entire refinery along with automation of the prioritised emergency pressure reduction sequence in the event of a large-scale earthquake.
Figure 4 Safety instrumentation for the refinery based on ProSafe-RS
Migration process
The migration of the DCSs throughout the refinery and the migration of the existing ESD circuit to ProSafe-RS had to be completed during the short period of the scheduled turnaround in 2009. Table 1 shows the outline of the migration. Although it was a big project, it was completed in just 14 days.
System migration in such a short time and without any trouble was achieved thanks to meticulous preparation, detailed scheduling including resource allocation, a startup team supported by a backup team, specialists and subsystem engineers capable of quick troubleshooting, and a "hot line" to the quality assurance department.
Effects of control room consolidation
Among the many positive effects of the consolidation of the control rooms, the greatest is a sense of unity and face-to-face communication between people, allowing them to broaden their outlook by working together.
The renovated control room makes people feel relaxed and secure, and as a result they can concentrate on plant operation. Improvements in data integrity and data availability accelerate communication between units to optimise the operation among units. Standardisation of operational procedures, a secondary effect of the system consolidation, has promoted the transfer of operational expertise. Introduction of the SIS has enhanced safety. Another intangible but valuable effect of the renovation is the motivation of young operators. They are stimulated by the new control room, the new systems and the new way of plant operation, as are all the people in the refinery.
Continuous improvement activities towards establishing the production centre are expected to create a variety of effects in the future.
Outline of the consolidation during the 2009 scheduled turnaround
Item | Description |
---|---|
Control room | Consolidating four control rooms into one |
Yokogawa's start-up team | Up to 60 |
Total loop and interlock tests | Switched signal: approx 15 000 points, completed in 14 days |
System migration | Simultaneous migration of 144 field devices. Breakdown: HMI: 44; server: 16; control station: 68; safety controller: 14 |
Future plan
The consolidation of control rooms and the migration of the production system prepared the infrastructure for further improvements at the refinery. The next steps towards organisational and operation procedural renovations have started.
Increased productivity of operators as a result of consolidation will be used for further improvement of plant operation as well as human resource development. Yokogawa continues the development of industry solutions such as Production Instructor and Exapilot, contributing to the tasks of capturing, amalgamating and optimising operational procedures as a contribution to operator effectiveness.
The consolidated control room is now the centre of operation and it will be an enabler of two-way optimisation of refinery operation, both refinerywide and organisation-wide. The refinery can be operated refinery-wide as one unit, while organisational integration can realise flexible production to accommodate a changing environment.
Отрасли
-
Апстрим/Добыча-Транспортировка
Добывающая промышленность включает в себя морскую и наземную деятельность, включая автоматизацию устья скважины, фракционирование, заканчивание и разделение для извлечения и подготовки подземной или подводной сырой нефти и природного газа.
Поскольку нефть поднимается на поверхность, она должна быть отделена перед транспортировкой. Первичная и вторичная стадии разделения обычно распределяют поток газа, поток воды и поток нефти в трехфазном разделении. Для перекачки газа требуется трубопровод и может включать процесс фракционирования на стадии до транспортировки. Жидкости могут быть помещены в резервуары или трубопроводы и отправлены на переработку, что требует точных измерений уровня.
-
Базовая химия
Компания Yokogawa обслуживает рынок химических продуктов массового производства по всему миру и является признанным лидером на этом рынке. Благодаря своим продуктам, решениям и отраслевому опыту компания Yokogawa понимает потребности рынка и производственные нужды и будет работать с Вами, чтобы обеспечить надёжное и экономически эффективное решение на протяжении всего жизненного цикла Вашего предприятия.
-
Нефтегазопереработка
В последние годы отрасль нефтегазопереработки сталкивается с возрастающим числом проблем. К таким проблемам относятся изменение характеристик перерабатываемого сырья, старение технологических установок и оборудования, рост стоимости энергоресурсов, нехватка квалифицированных операторов, способных безопасно и эффективно управлять НПЗ, а также постоянно меняющиеся требования рынка и потребителей.
На протяжении долгого времени компания Yokogawa сотрудничает со многими компаниями из перерабатывающей отрасли промышленности, предоставляя промышленные решения, направленные на решение таких вызовов и проблем. Решения VigilantPlant компании Yokogawa помогли владельцам предприятий добиться максимальной прибыльности и устойчивой безопасности на их предприятиях.
-
Нефтепереработка
На постоянно меняющемся рынке нефтеперерабатывающие заводы рассматриваются не только как единицы переработки сырой нефти, но и как центры прибыли. В то же время существует острое осознание необходимости обеспечения безопасности на таких объектах. Комплексное производственное решение, которое включает в себя производственное и календарное планирование, управление и контроль, необходимо для достижения долгосрочных целей по прибыльности, эффективности и защите окружающей среды. Обладая многолетним опытом в области автоматизации, Yokogawa может предложить вам доступные комплексные решения для повышения работоспособности и более чистого мира.
-
Нефтехимия
Потребности нефтехимических компаний весьма разносторонни. Для того, чтобы выйти на первые места на сегодняшнем высоко конкурентном рынке, производителя постоянно стремятся улучшить качество и производительность. Компания Yokogawa обеспечивает индивидуальные решения для таких потребностей в отрасли на основе своего долго и разнообразного опыта в ней.
-
Нефть и газ
Компания Yokogawa обладает богатым опытом во всех сферах нефтегазового бизнеса: от морских и сухопутных сооружений до трубопроводов, терминалов и глубоководных операций. Мы предлагаем решения, которые повышают безопасность, обеспечивают точную и надёжную эксплуатацию и увеличивают эффективность предприятия.
-
Применения в морских условиях (FPSO, FLNG и FSRU)
Для проведения морской разведки и добычи требуется обеспечение максимальной работоспособности в суровых условиях. На объектах, эксплуатируемых как с обслуживающим персоналом, так и с режимом работы по безлюдной технологии, необходимы надёжные интегрированные системы управления и безопасности (ИСУБ) с расширенными возможностями дистанционного мониторинга. Компания Yokogawa обладает самыми современными технологиями и обширным опытом реализации проектов в морских условиях любого масштаба и уровня сложности автоматизации.
-
Химическая промышленность
Химические производства применяют периодические и непрерывные технологические процессы производства, каждый из которых имеет свои особые требования для систем управления. Непрерывному технологическому процессу требуется надёжная и стабильно работающая система управления, защищающая от внеплановых остановов, в то время как для периодических процессов более важна гибкость организации партий, возможности внесения корректировок в рецепты и формулы. Для обоих типов процессов одинаково важно вести управление с поддержанием требуемого качества и способность управлять не рутинными операциями. Имея в наличии обширный послужной список и богатое портфолио проектов, а также опытных системных инженеров и обширную сеть поддержки по всему миру, у компании Yokogawa имеются решения для всех видов таких систем.
Related Products & Solutions
-
SIS (Up to SIL 3) ProSafe-RS
The ProSafe-RS is a Safety Instrumented System that is certified by the German certification organization (TÜV) to meet Safety Integrity Level (SIL) 3 specified in IEC 61508.
-
Распределенная система управления (РСУ)
Наша распределенная система управления (РСУ) обеспечивает автоматизацию и управление промышленными процессами и улучшенную производительность бизнеса. Более 10 000 заводов поручают компании Yokogawa DCS выполнить свои производственные задачи