Executive Summary

Replacement of outdated heat/CO2 transfer system

Greenhouse
Greenhouse

ENECO Energie was looking to update its system for transferring heat and CO2 from a power station to greenhouses because replacement parts were no longer available for its existing system and communications were frequently disrupted. Yokogawa proposed a comprehensive and integrated system using STARDOM FCN/FCJ controllers as intelligent RTUs and a FAST/ TOOLS SCADA package. After evaluating the proposals submitted by several different system integrators, ENECO awarded this project to Yokogawa for the following reasons, each of which helped minimize the total cost of ownership:

  • Reduced cabling costs by using a commodity GPRS network infrastructure
  • Additional reduction in system cost by making full use of existing components
  • Reduction in cost of software by using all web-based technology
  • Long-term service contract – no need to worry about a suspension of maintenance services

The customer is very happy with this updated system that employs state of the art technology.

About ENECO Energie

ENECO Energie is one of the three major energy companies in the Netherlands. The company provides an integrated range of services based on the transportation and supply of electricity, gas and heat, and associated services such as metering, installation and invoicing. In all, ENECO Energie serves some two million business and household customers.

Customer Endorsement

"Yokogawa's proposal was based on the most complete and integrated system, with all components highly matched to work together."
— Mr. Ton van Koppen of ENECO Energie

Mr. Ton van Koppen of ENECO Energie
Mr. Ton van Koppen

About the Project

The ROCA power station near Capelle a/d IJssel, The Netherlands, burns gas to generate electricity. The resulting heat and CO2 are essential to the growth and photosynthesis of plants. ENECO Energie built a pipeline network to transfer this heat and CO2 to the greenhouses of 138 market gardeners in the Bleiswijk district. To regulate the transfer of heat and CO2, STARDOM FCN autonomous controllers were installed in each greenhouse, and FAST/TOOLS was installed at the central control room in Rotterdam to perform data acquisition and remote monitoring and control.

The Challenges and the Solutions

Reduced Cabling Cost with a Commodity Network Infrastructure and GPRS

System Configuration

System Configuration

The deciding factor in opting for Yokogawa's solution was the use of GPRS for (TCP/IP) network communications between the local STARDOM controllers and FAST/TOOLS. Modern technology replaces the outmoded combination of telephone lines and fiber optic cables. Besides reducing the costs of cabling, this new method of communication is also much more reliable.

"With the GPRS network, the error-proneness of the fixed lines have been eliminated. To enable communication with the GPRS network, the STARDOM controllers are each equipped with a mobile communication module. This then transmits the I/O's to the Rotterdam head office over the GPRS network."
– Mr. Van Koppen

Additional Reduction in System Cost by Making Full Use of Existing Components

The customer preferred to continue using existing cabinets, CO2 meters, and energy totalizers. The STARDOM controllers fit perfectly in the cabinets and connected easily to this previously installed equipment. "Each site controller is installed in an existing cabinet, and controls both the heat (temperature and supply) via a plate heat exchanger, and the CO2", explains Mr. Van Koppen.

Site Photo
Site Photo

Reduction in Cost of Software by Using all Web-based Technology

The FAST/TOOLS package that performs data acquisition and control functions from the central control room features a web-based implementation that enables a standard browser to be used as the control system interface. FAST/TOOLS also provides a link to the ENECO website. The market gardeners can make heat and CO2 settings and view a number of parameters via the Internet. No specialized software is required on their PCs, so there is no need to worry about software maintenance.

"The growers can login to our site via the Internet, so that they can view a number of important parameters related to the functioning of their own delivery station."
–Mr. Van Koppen.

ENECO Web Site
ENECO Web Site

Long-term Reliability – No Need to Worry About Maintenance

The ENECO Energie heat and CO2 network is a typical small-scale process that calls for an off-the-shelf industrial automation system with fast-track implementation. Although the project was quickly implemented, Yokogawa was able as a system solution provider to guarantee a long-term service contract to this customer.

<System delivered>
SCADA: FAST/TOOLS
Intelligent RTU: 138 STARDOM FCN autonomous controllers

<Related Article>
If you would like to know more about the ENECO project from the application point of view, please refer to the ENECO Energie application note.

업종

  • 열병합발전

    열병합발전 (CHP)은 단일 연료 공급원에서 전력 및 열에너지를 생성하는 효율적인 방법입니다.

    See More
  • 전력

    1970년대 중반, Yokogawa는 EBS 전기 제어 시스템 (EBS Electric Control System)의 출시와 함께 전력 사업에 진출했습니다. 그 이후로 Yokogawa는 전 세계 고객에게 최상의 서비스와 솔루션을 제공하기 위한 기술과 역량의 개발을 꾸준히 지속해 왔습니다.

    Yokogawa는 역동적인 글로벌 전력 시장에서 더욱 적극적인 역할을 수행하기 위해 글로벌 전력 솔루션 네트워크를 운영했습니다. 이로 인해 Yokogawa 내에서 보다 긴밀한 팀워크가 가능해져서 글로벌 리소스와 업계 노하우를 하나로 모았습니다. Yokogawa의 전력 산업 전문가들은 각 고객에게 정교한 요구 사항에 가장 적합한 솔루션을 제공하기 위해 협력합니다.

    See More

Related Products & Solutions

  • FCN-500

    중요한 프로세스를 제어하는 시스템에는 높은 신뢰성과 빠른 속도가 필수적입니다. Field Control Node(FCN) 자율 컨트롤러의 Dual 이중화 모델은 모듈을 교체하더라도 이러한 프로세스가 중단 없이 계속되도록 보장합니다.

    See More
  • Process Control PLC/RTU

    프로세스 공장에서 원격 위치에 이르기까지 당사의 공정제어 PLC 및 원격 터미널 장치 (RTU)는 사용자가 운영의 우수성을 극대화하도록 돕습니다.

    See More

Top