Safe and Efficient Power Plant Operation / Tuas 1 Power Plant

다운로드 (62 KB)

Total Solutions Enhance a Plant's Workforce

Map

Location: Tuas, Singapore
Output/fuel: 1200 MW (2 × 600 MW), oil/gas fired
Owners: Tuas Power Pte Ltd, Singapore
Overview: The construction of Tuas Power Station started in the mid 1990s. The plant has steadily grown to be a significant player in the competitive Singaporean electricity market. Stage One of Tuas Power Station is equipped with the country's largest steam generators which are capable of producing 600 MW each.

Project

Tuas Power Station: Plant view
Safe and Efficient Power Plant Operation /
Tuas 1 Power Plant

Operation date: 1999
Project type: Greenfield site
Plant configuration:
Boilers: Babcock-Hitachi, Japan
Steam turbines: Hitachi, Japan
Overview: Yokogawa supplied an integrated distributed control system (DCS) for this plant's very large power generation units as part of the work in stage one. Yokogawa Electric Asia Pte. Ltd., Singapore produced the control system in Singapore and carried out all engineering work.

(Solutions/benefits)
Single source solution:
The plant successfully entered commercial operation on schedule and the plant owner attributed this in part to Yokogawa's good performance in delivering both products and services.
On-time commercial operation:
In addition to supplying Instrumentation & Control (I&C) equipment, Yokogawa handled system design/engineering, configuration, project management, commissioning services and maintenance. Operator/engineer training on a replica simulator and control room design were also provided.

System

Tuas Power Station: Full replica simulator
Full Replica Simulator

Control scope:
Coordinated boiler and turbine controls including:
burner management system
electrical distribution system
water and waste water treatment
other auxiliary plant controls

System equipment:
CENTUM CS
Computer station for unit performance calculation
Full scope, high fidelity training simulator
Sequence event monitoring system
Emergency shutdown system

(Replica Simulator Showcase)
A full scope, high fidelity training simulator was supplied by a wholly owned Yokogawa subsidiary, TechComm Simulation Pty Ltd. This simulator provides training in all aspects of operating complex plant systems. It has made a significant contribution in raising the skill levels of the highly motivated Tuas Power Station workforce.

Central Control Room (CCR) Design by Yokogawa

Tuas Power Station: Control Room Design

(CCR Design Showcase)
Yokogawa also designed the Tuas Power Station's Central Control Room, which has won praise from users for its good operating environment. Our CCR design methodology emphasizes the importance of sound ergonomic design in reducing operator errors and facilitating the smooth running and control of processes.

업종

  • 전력

    1970년대 중반, Yokogawa는 EBS 전기 제어 시스템 (EBS Electric Control System)의 출시와 함께 전력 사업에 진출했습니다. 그 이후로 Yokogawa는 전 세계 고객에게 최상의 서비스와 솔루션을 제공하기 위한 기술과 역량의 개발을 꾸준히 지속해 왔습니다.

    Yokogawa는 역동적인 글로벌 전력 시장에서 더욱 적극적인 역할을 수행하기 위해 글로벌 전력 솔루션 네트워크를 운영했습니다. 이로 인해 Yokogawa 내에서 보다 긴밀한 팀워크가 가능해져서 글로벌 리소스와 업계 노하우를 하나로 모았습니다. Yokogawa의 전력 산업 전문가들은 각 고객에게 정교한 요구 사항에 가장 적합한 솔루션을 제공하기 위해 협력합니다.

    See More
  • 화력발전

    석탄, 석유 또는 가스를 연료로 사용하는 화력발전은 전 세계적으로 대부분의 전력을 생산하고 있습니다.

    See More

Related Products & Solutions


Top